4/9/22

Two Weeks into Spring Term

 Got off to a slow start, with a bunch of late returners, but are sailing along pretty well now.  More than half the inwales are installed, with the remainder to get done early next week.  The biggest bottleneck is the number of clamps we own, which is a lot, but not enough to do five boats at a time (the largest class section size).