4/14/21

April 14th

 

A lot accomplished in a couple weeks: The boat furthest along has both thwarts in and is ready for rub-rail fabrication. Most front thwarts have some sort of custom engraving, and will be installed soon. 


There are some small details: floorboards, and seats to deal with, but the frames are nearly ready for varnishing.


And in the back room:


The stitch-and-glue dinghy is coming along.


The seams are being filled and shaped, and then the fibreglass will cover the bottom 'plannk'.


4/1/21

Design Development-how I spent my Spring Break

 


This one has stems with more curve, and a beefed-up gunwale. The front thwart is more basic, being just a straight bar. I also tweaked the width of the boat at the thwarts so that the bow is a bit narrower than the stern, to see what effect that will have on tracking.