7/9/14
Boatbuilding Workshop - Wednesday
Another big day. All the frames are done; two boats have their rub rails drilled and finished.
This frame is nearly done. The rub rails need to be drilled and trimmed.
This frame has a 1/2 coat of polyurethane
.
Caned seat from Ed's Canoe
Another view.
Newer Post
Older Post
Home