7/9/14

Boatbuilding Workshop - Wednesday

Another big day.  All the frames are done; two boats have their rub rails drilled and finished.

This frame is nearly done.  The rub rails need to be drilled and trimmed.





















This frame has a 1/2 coat of polyurethane.




















Caned seat from Ed's  Canoe
















Another view.